Seaview Boulevard Construction

Seaview Boulevard Construction
Posted on 04/05/2024
Seaview Boulevard will be closed to through traffic for approximately 20 weeks starting on Monday, April 8 for construction on the road.

The work includes:
     • replacement of water, sewer and stormwater infrastructure
     • installation of a concrete sidewalk
     • installation of concrete curbs
     • full roadway resurfacing

Traffic control personnel will be on site assisting with local access. Minor traffic delays can be expected periodically. Detour signage will be in place to direct traffic around the closure via Westview Drive and Belvedere Avenue.

For more information contact the Public Works Department by emailing [email protected] or calling at (902) 894-5208.